
An OEM path for liquid-cooled storage programs
Five stages from brief to container for liquid-cooled BESS cabinets—built for EPCs and distributors who need dates, not vague promises.
Good export storage programs feel boring on purpose: clear interface drawings, predictable sample loops, and packing that does not surprise customs. CellStack Energy runs OEM/ODM BESS projects in five stages—communication, design, prototype, inspection pathway, then mass production.
For liquid-cooled cabinets, thermal and leak-path notes matter as much as nameplate kWh. A cabinet that looks clean in a showroom can fail if manifold service access was never designed for field techs.
What we send with every pilot lot
- Latest drawing and change note
- Basic BMS/PCS checklist
- Packing photo and label proof
- Suggested next volume window
If you already have a regional enclosure or need a dual-line (air + liquid), tell us in the first inquiry.